Close Menu
    Facebook LinkedIn YouTube WhatsApp X (Twitter) Pinterest
    Trending
    • These Were My Favorite Things Samsung Unpacked During Its 2026 Galaxy Event
    • AI minister role boosted but tech department axed in Burnham shake-up
    • Loop Engineering for RAG Question Parsing: The Small Loop That Runs Before Retrieval
    • The risk of weather data sabotage is rising
    • Hand-E Now Reaches 100 mm Without Giving Up an Ounce of Precision
    • Weight loss drug effectiveness and long term maintenance
    • Here’s what Albo’s ‘Office of AI’ means for Australian tech
    • YouTube and X Have Become ‘Gateways’ to Nudify Apps
    Facebook LinkedIn WhatsApp
    Times FeaturedTimes Featured
    Wednesday, July 22
    • Home
    • Founders
    • Startups
    • Technology
    • Profiles
    • Entrepreneurs
    • Leaders
    • Students
    • VC Funds
    • More
      • AI
      • Robotics
      • Industries
      • Global
    Times FeaturedTimes Featured
    Home»Technology»NASA Is Making Big Changes to Speed Up the Artemis Program
    Technology

    NASA Is Making Big Changes to Speed Up the Artemis Program

    Editor Times FeaturedBy Editor Times FeaturedFebruary 28, 2026No Comments3 Mins Read
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Telegram Email WhatsApp Copy Link


    “That is simply not the fitting pathway ahead,” Isaacman mentioned.

    A senior NASA official, talking on background to Ars, famous that the area company has skilled hydrogen and helium leaks throughout each the Artemis I and Artemis II prelaunch preparations, and these issues have led to monthslong delays in launch.

    “If I recall, the timing between Apollo 7 and eight was 9 weeks,” the official mentioned. “Launching SLS each three and a half years or so shouldn’t be a recipe for achievement. Definitely, making every one in all them a murals with some main configuration change can be not useful within the course of, and we’re clearly seeing the outcomes of it, proper?”

    The objective subsequently is to standardize the SLS rocket right into a single configuration as a way to make the rocket as dependable as potential, and launching as incessantly as each 10 months. NASA will fly the SLS car till there are business alternate options to launch crews to the moon, maybe via Artemis V as Congress has mandated, or maybe even a little bit longer.

    Is Everybody on Board?

    The NASA official mentioned all the company’s key contractors are on board with the change, and senior leaders in Congress have been briefed on the proposed modifications.

    The largest opposition to those proposals would seemingly come from Boeing, which is the prime contractor for the Exploration Higher Stage, a contract price billions of {dollars} to develop a extra highly effective rocket that was as a consequence of launch for the primary time later this decade. Nonetheless, in a NASA information launch, Boeing appeared to supply at the least some assist for the revised plans.

    “Boeing is a proud companion to the Artemis mission and our crew is honored to contribute to NASA’s imaginative and prescient for American area management,” mentioned Steve Parker, Boeing Protection, Area & Safety president and CEO, within the information launch. “The SLS core stage stays the world’s strongest rocket stage, and the one one that may carry American astronauts on to the moon and past in a single launch. As NASA lays out an accelerated launch schedule, our workforce and provide chain are ready to satisfy the elevated manufacturing wants.”

    Strong Causes for Altering Artemis III

    NASA’s new method to Artemis displays a return to the philosophy of the Apollo program. Through the late Nineteen Sixties, the area company flew a collection of preparatory crewed missions earlier than the Apollo 11 lunar touchdown. These included Apollo 7 (a low-Earth-orbit check of the Apollo spacecraft), Apollo 8 (a lunar orbiting mission), Apollo 9 (a low-Earth-orbit rendezvous with the lunar lander), and Apollo 10 (a check of the lunar lander descending to the moon, with out touching down).

    With its earlier Artemis template, NASA skipped the steps taken by Apollo 7, 9, and 10. Within the view of many business officers, this leap from Artemis II—a crewed lunar flyby of the moon testing solely the SLS rocket and Orion spacecraft—to Artemis III and a full-on lunar touchdown was huge and dangerous.

    The Artemis II crew rehearse a walkout from the Neil A. Armstrong Operations and Checkout Constructing at NASA’s Kennedy Area Heart.{Photograph}: Joe Raedle/Getty Photos



    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Editor Times Featured
    • Website

    Related Posts

    YouTube and X Have Become ‘Gateways’ to Nudify Apps

    July 14, 2026

    Where NASA Posts Its Best Space Photos, and How to Find Them

    July 4, 2026

    Google Home Speaker Review: Leading the Pack, Again

    June 24, 2026

    20 Best Gifts for Men, Manly Men, and Menly Man Men (2026)

    June 14, 2026

    How a Citizen Science Organization Aims to Preserve the Places It Brings Tourists to Study

    June 6, 2026

    The US Has a Plan to Combat Screwworm. It Involves a Lot More Flies

    June 5, 2026

    Comments are closed.

    Editors Picks

    These Were My Favorite Things Samsung Unpacked During Its 2026 Galaxy Event

    July 22, 2026

    AI minister role boosted but tech department axed in Burnham shake-up

    July 21, 2026

    Loop Engineering for RAG Question Parsing: The Small Loop That Runs Before Retrieval

    July 19, 2026

    The risk of weather data sabotage is rising

    July 18, 2026
    Categories
    • Founders
    • Startups
    • Technology
    • Profiles
    • Entrepreneurs
    • Leaders
    • Students
    • VC Funds
    About Us
    About Us

    Welcome to Times Featured, an AI-driven entrepreneurship growth engine that is transforming the future of work, bridging the digital divide and encouraging younger community inclusion in the 4th Industrial Revolution, and nurturing new market leaders.

    Empowering the growth of profiles, leaders, entrepreneurs businesses, and startups on international landscape.

    Asia-Middle East-Europe-North America-Australia-Africa

    Facebook LinkedIn WhatsApp
    Featured Picks

    Spotify Will Reportedly Get More Expensive in the US Next Year. Here’s What to Expect

    November 25, 2025

    U.S. Plans $80 Billion Nuclear Power Expansion

    December 19, 2025

    Vermilion High School teacher has illegal bingo charges dropped

    September 28, 2025
    Categories
    • Founders
    • Startups
    • Technology
    • Profiles
    • Entrepreneurs
    • Leaders
    • Students
    • VC Funds
    Copyright © 2024 Timesfeatured.com IP Limited. All Rights.
    • Privacy Policy
    • Disclaimer
    • Terms and Conditions
    • About us
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.