Close Menu
    Facebook LinkedIn YouTube WhatsApp X (Twitter) Pinterest
    Trending
    • Dog tracker uses Starlink for lost pets when cell signal drops
    • Sniffing chocolate for ‘leg day’ at the gym is the latest craze. Here’s the reality
    • Silicon Valley Is Completely Divided Over Chinese AI
    • Tabcorp fined after ACMA marketing breach investigations
    • These Were My Favorite Things Samsung Unpacked During Its 2026 Galaxy Event
    • AI minister role boosted but tech department axed in Burnham shake-up
    • Loop Engineering for RAG Question Parsing: The Small Loop That Runs Before Retrieval
    • The risk of weather data sabotage is rising
    Facebook LinkedIn WhatsApp
    Times FeaturedTimes Featured
    Monday, July 27
    • Home
    • Founders
    • Startups
    • Technology
    • Profiles
    • Entrepreneurs
    • Leaders
    • Students
    • VC Funds
    • More
      • AI
      • Robotics
      • Industries
      • Global
    Times FeaturedTimes Featured
    Home»Tech Innovation»World’s largest skyscraper project halted in Saudi Arabia
    Tech Innovation

    World’s largest skyscraper project halted in Saudi Arabia

    Editor Times FeaturedBy Editor Times FeaturedJanuary 28, 2026No Comments2 Mins Read
    Facebook Twitter Pinterest Telegram LinkedIn Tumblr WhatsApp Email
    Share
    Facebook Twitter LinkedIn Pinterest Telegram Email WhatsApp Copy Link


    Mukaab, the world’s largest skyscraper, is without doubt one of the most bold building initiatives ever conceived. Nevertheless, in line with a brand new report, Saudi authorities have stopped building of the the big constructing, and its future now seems unsure.

    Mukaab would have risen to a powerful peak of 400 m (1,312 ft) within the Saudi capital Riyadh. Extra importantly, it might even have been simply as lengthy and large as it’s tall. This is able to make it in a position to theoretically match 20 Empire State Buildings inside it and cement its standing because the world’s largest – although not tallest – skyscraper.

    The design of the cuboid constructing’s ornamental exterior riffed on conventional Islamic structure, whereas its inside would have had a floorspace of round 2 million sq. meters (0.77 sq. miles). At its middle was to be one other massive twisting tower. Excavation work was nearing completion as of late 2024 and 10 million cubic meters (roughly 350 million cubic ft) of earth had already been eliminated.

    The huge groundwork and foundations for Mukaab are already properly underway but it surely seems they may stay unfinished for now

    New Murabba

    Nevertheless, in line with a reputable report by Reuters, Saudi authorities have stopped work on the event whereas they reassess its financing and feasibility. Moreover, the district that the brand new constructing would anchor, named New Murabba, has now been delayed from a 2030 completion date to 2040.

    The report means that the dominion is pivoting from heavy spending on flashy structure initiatives in favor of preparing for the 2034 World Cup soccer event and the Qiddiya tourism vacation spot. It additionally displays fiscal stress from oil costs being properly beneath ranges required to fund the bold transformation. One other casualty of this new strategy appears to be the Trojena gigaproject, as Saudi Arabia just lately introduced that it might indefinitely postpone internet hosting the 2029 Asian Winter Video games there.

    What all this implies for the opposite remaining Saudi gigaprojects is not clear at this stage, however the temper music coming from the desert nation is not constructive. Nonetheless, as of writing, the world’s new tallest constructing, the JEC Tower, is racing to completion and the skyscraper metropolis, the Line remains to be underway too – at the least for now.

    Supply: Reuters [paywalled]





    Source link

    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Editor Times Featured
    • Website

    Related Posts

    Dog tracker uses Starlink for lost pets when cell signal drops

    July 26, 2026

    Weight loss drug effectiveness and long term maintenance

    July 16, 2026

    Portable bunkers ready for disaster survival

    July 6, 2026

    Electronic nose detects spoiled food in your fridge

    June 26, 2026

    Personal UV tracking for better sun protection

    June 16, 2026

    Toyota Corolla GRMN: Nürburgring-proven hot hatch unveiled

    June 6, 2026

    Comments are closed.

    Editors Picks

    Dog tracker uses Starlink for lost pets when cell signal drops

    July 26, 2026

    Sniffing chocolate for ‘leg day’ at the gym is the latest craze. Here’s the reality

    July 25, 2026

    Silicon Valley Is Completely Divided Over Chinese AI

    July 24, 2026

    Tabcorp fined after ACMA marketing breach investigations

    July 23, 2026
    Categories
    • Founders
    • Startups
    • Technology
    • Profiles
    • Entrepreneurs
    • Leaders
    • Students
    • VC Funds
    About Us
    About Us

    Welcome to Times Featured, an AI-driven entrepreneurship growth engine that is transforming the future of work, bridging the digital divide and encouraging younger community inclusion in the 4th Industrial Revolution, and nurturing new market leaders.

    Empowering the growth of profiles, leaders, entrepreneurs businesses, and startups on international landscape.

    Asia-Middle East-Europe-North America-Australia-Africa

    Facebook LinkedIn WhatsApp
    Featured Picks

    In search of riches, hackers plant 4G-enabled Raspberry Pi in bank network

    August 4, 2025

    Explore IEEE Board’s Impactful Leadership

    May 23, 2025

    Smartphone Sales to Plummet 13% in 2026 Due to RAM Crisis, Says IDC

    February 27, 2026
    Categories
    • Founders
    • Startups
    • Technology
    • Profiles
    • Entrepreneurs
    • Leaders
    • Students
    • VC Funds
    Copyright © 2024 Timesfeatured.com IP Limited. All Rights.
    • Privacy Policy
    • Disclaimer
    • Terms and Conditions
    • About us
    • Contact us

    Type above and press Enter to search. Press Esc to cancel.